NAM L13-F1 installation

23 oktober 2017

In May 2017 we participated in the NAM L13-F1 installation project in the Dutch sector of the North Sea, together with Scaldis Salvage & Marine Contractors NV. With the use of our TRIPLE CV-320 VLT-U (960kgm Vibro Lifting Tool) the 40.5m long and 360t weighing monopile was picked up from a barge, upended to vertical position and driven in the seabed without any gripper frame or seabed installation frame.

Please have a look at the short video on this unique installation.

https://lnkd.in/gSbu95M

Do you have a question? Contact us. Contact