Riffgat; great success

03 september 2012

Monday morning 3 September 2012, around 4 am, the last windmill foundation pile for the Riffgat windmill park was installed.

This was the longest and heaviest pile that has ever been driven by a vibratory hammer in the world. This pile was 71.6 meter long and had a weight of 747.3 metric ton. In total (C)APE Holland installed all the 30 windmill foundation piles with the Super Quad Kong vibratory hammer without any down time!

Do you have a question? Contact us. Contact