Pipe Line Starter Piles - Gina Krog, North Sea

07-08-2015

A single starter pile for pipe laying was installed to serve as a reaction pile in order to lay pipe line. At the completion of the pile laying process the pile was extracted.

The pile was installed in the North Sea, Norwegian Sector, at a water depth of approximately 116 m.

Reason for equipment choice

  • One tool for positioning and installation
  • No template required
  • Extraction of pile 
  • Reuse of pile possible due to low fatique induced.
Do you have a question? Contact us. Contact