Monopile installation OWF Taiwan (2019)
17-01-2020
For an offshore Wind Farm in Taiwan, a Vibro Lifting Tool (TRIPLE CV-320 VLT) was used to drive monopiles up to 1000t. The challenging soil conditions at the location posed a risk on pile run or drop fall. This risk is mitigated by the Vibro Lifting Tool, as there is a fixed connection between the tool and the pile and load is kept in the crane at all times.Piles where installed to a save depth(through pile run risk layers) and driven to final penetration with an impact hammer.