Pin pile installation Lime Tree Terminal Project (2019)

17-01-2020

A total of 4 pile where upended and installed for seabed connections in the waters around the isle of St. Croix (US Virgin Islands). CAPE Holland supplied a CV-80 VLT-U  plus a 150 kJ Impact Hammer with just one dedicated hydraulic power unit and hose reel. The VLT was used because the seabed structure did not provide lateral support for impact driving. The impact hammer was not needed as the CV-80 VLT-U reached required penetration. Due to good conditions and an excellent cooperation between SBM’s and CAPE’s crew, the project was executed in record breaking time.